Emergency Escape-way
Design, manufacture and equipping of a 60m near-vertical emergency escape-way.
This includes:
- Civil construction of floors at landings.
- Drilling and installation of chemical suspension anchors for mounting of escape-way staircase and pipe columns.
- Structural work at heights – lifting and lowering of structural steel to install staircase and piping in steeply inclined (80°) excavation.
- Installation of LT electrical cabling and lighting.
|
 |
Underground Trackless Equipment Service and Repair Bay
Design, manufacture and construction of an underground service bay.
This includes:
- Civil construction of floors, service well, crawl gantry plinths, storage areas and an oil separation system.
- Structural erection of crawl gantries and storage areas.
- Mechanical installation of gantry crawls, Drizit unit and pumps for grease and oil waste handling.
- Electrical installation of small power and lighting.
|
 |
Chrome Plant Construction
Manufacture, supply and construction of a Chrome Extraction facility.
This includes:
- Civil construction of the building plinths, floors and bunds.
- All structural flooring, hand railing and staircase manufacturing and erecting.
- IBR roof cladding.
|
 |
Industrial Change House
Design, manufacture, supply, and construction of an industrial change house.
This includes:
- Earthworks and terrace preparation.
- Civil construction of foundations.
- Building work, complete with plumbing, electricals etc.
- Structural erection of columns and roof trusses.
- Roof IBR cladding.
|
 |
Surface Fan Installation
Design, manufacture and supply, construction and installation of surface ventilation fans.
This includes:
- Manufacture of "shaft-to-fan" ducting.
- Installation of ventilation ducting.
- Installation of four 75kW fans.
- Installation of electrical power supply.
|
 |
Explosives Transfer Facility
Design, manufacture and construction of an explosives transfer and storage area facility at a shaft head.
This includes:
- Bulk earthworks and preparation of terrace.
- Installation of lightning arrestor grid.
- Civil construction of concrete floors, column plinths and explosives storage tank bases.
- Structural erection of roof columns, trusses and IBR cladding.
- Electrical installation of small power and lighting.
|
 |
Automated Diesel Batching System
Design, manufacture and construction of an automated Diesel batching system for the transfer of Diesel from surface to the underground Diesel dispensing facility.
This includes:
- Civil construction of floors, tank bases and bund walls on surface as well as the provision of pressure breaks at pre-determined vertical intervals.
- Structural erection and installation of storage, batching and receiver tanks.
- Installation of piping on surface and down vertical shaft.
- Installation of all pumping systems.
- Installation of control and automation instrumentation.
|
 |
Temporary Workshop/Service Facility at a Decline Project
Design, manufacture and construction of temporary surface workshop facilities.
This includes:
- Civil construction of concrete floors, column plinths and crawl gantry plinths.
- Structural erection of crawl gantries, roof columns, trusses and IBR roof cladding.
- Mechanical installation of gantry crawls.
- Electrical installation of small power and lighting.
|
 |
Surface Diesel Storage and Dispensing Facility
Design, Supply and construction of Diesel storage and dispensing facilities on surface.
This includes:
- Civil construction of floors, tank bases and bund walls.
- Structural installation of 23kL storage tank.
- Installation of Drizit trap for contaminated water handling.
- Installation of pumps and piping.
- Installation of level and metering instrumentation.
- Installation of power supply and lighting.
|
 |
Hartbeespoort Dam Aerial Cableway.
Zinpro Engineering was involved in a consultative role with the upgrade of the Hartbeespoort Dam Aerial Cableway.
This includes:
- Upgrade of the original cableway, built and commissioned in 1972, to comply with the latest requirements of the Manufacturer’s Standard and to resolve issues that historically proved problematic.
|
|
|
|
|